ConfiaTech

Backend · Cloud

企业级 ERP 迁移平台

从遗留 ERP 无缝迁移至现代云端。

ClientSequest ConsultingIndustryEnterprise SoftwareDuration26 weeksTeam1 PM, 5 engineers, 1 designer
Visit live site
Sequest Consulting — hero mockup

Screens

01

挑战

Manufacturing enterprises struggled with complex, time-consuming ERP migrations to Infor LN, facing downtime and productivity losses.

02

我们的方法

Built scalable migration platform using agile methodologies and template-based implementation with business process optimization tools.

成果

Outcomes we delivered.

  • Minimized migration downtime
  • Improved enterprise productivity
  • Scalable and user-friendly solution
  • Secure AWS deployment with high performance
技术栈
  • Angular
  • Django
  • PostgreSQL
  • AWS
  • Docker
  • Redis

What we delivered

Capabilities shipped.

This engagement combined several of ConfiaTech's core capabilities. Each contributed a specific outcome to the final product.

  1. 01

    后端开发

    Scope

    Node.js、Python、Django、FastAPI、.NET。为规模化与可观测性打造的 API 与服务。

  2. 02

    云与 DevOps

    Scope

    AWS、Azure、GCP。IaC、CI/CD。

  3. 03

    前端开发

    Scope

    Next.js、React、Angular、Astro、WordPress。像素级精准、瞬间加载的界面。

  4. 04

    QA 与测试

    Scope

    自动化测试套件、回归覆盖与手动 QA 周期,让发布在每个浏览器与设备上都保持稳定。

  5. 05

    DevOps 与 CI/CD

    Scope

    流水线、容器编排与基础设施即代码,让每次提交都能安全上线,并内建可观测性。

How we delivered it

How this project shipped.

Every case study on this site follows the same delivery spine — the four-phase process we have refined across many production engagements.

  1. 01

    Discovery & Strategy

    1–2 weeks

    Stakeholder interviews, technical audit, success metrics, phased roadmap.

  2. 02

    Design & Prototyping

    2–4 weeks

    User research, design systems, interactive prototypes approved before code.

  3. 03

    Development & QA

    4–16 weeks

    Two-week sprints, weekly demos, automated testing, continuous deployment.

  4. 04

    Launch & Scale

    Ongoing

    Production rollout, observability, incident response, feature evolution.

Why ConfiaTech for projects like this

  • Expert engineers, end to end

    Every contributor on the engagement had at least five years of production experience. No learning on the client dime.

  • KPI-anchored delivery

    Outcomes — not deliverables — drive the roadmap. Weekly demos report progress against the metric, not against the backlog.

  • Runbooks before launch

    Production observability, incident playbooks, and handoff documentation ship with every release.

  • Continuity past launch

    The same engineers who built the product support and evolve it. Institutional knowledge stays inside the engagement.

Have a similar project in mind?

Walk us through your problem. Within one business day a expert engineer will recommend the engagement model, team composition, and timeline that maps closest to this case study.

开始对话